Cayucos Water Reclamation Facilities
Cayucos, CA
Project Stats
Ashley & Vance Engineering provided structural engineering services from design through construction for a new wastewater treatment and reclamation facility with an average daily flow of approximately 0.3 million gallons per day (MGD) to serve the surrounding area. Under City and State requirements, and with a $20 million project budget, our designs included a subterranean concrete membrane bioreactor tank, concrete headworks, site walls, multiple processing buildings (including those with pre-engineered metal buildings [PEMBs]), plus tank and mechanical equipment foundations.