Santa Rosa & Monterey Mixed Use

San Luis Obispo, CA

Project Stats

A three-story steel framed commercial shell building situated over an existing buried concrete culvert. Deepened concrete caissons, along with concrete grade beams and collapsible formwork were used to distribute building loads away from the culvert.