NAVFAC - Guam - U.S. Territory

2D and 3D CAD Files to be Used with the Contractors
Mulitiple Finish Grade Surfaces
2 Stormwater Detention Basis
Stormpiping
2D and 3D CAD Files to be Used with the Contractors
Mulitiple Finish Grade Surfaces
2 Stormwater Detention Basis
Stormpiping
Project Info: 

<p>The 32 acre site located on a former World War II battlefield is being constructed by <a href="http://wattsconstructors.com/home2010.jsp;jsessionid=076684C0440A6072B56... target="_blank">Watts Constructors</a>. &nbsp;Ashley &amp; Vance Engineering provided construction support for GPS positioning related to earth work, piping, and site features.&nbsp;<br /><br />Project Features:</p><ul><li>Over one mile new road</li><li>2 stormwater detention basis</li><li>stormpiping</li><li>generator building</li><li>28 structures</li></ul><p>Our civil engineering group created 2D and 3D CAD files to be used with the Contractors <a href="http://construction.trimble.com/products/site-positioning-systems" target="_blank">Trimble</a> GPS positioning equipment. &nbsp;This included creation of mulitiple finish grade surfaces, and earth work excavation calculations. &nbsp;This process allowed the Contractor to build the project safer, faster, resulting in significant cost savings for the Navy.&nbsp;</p><p>Owner: U.S. Navy</p><p><a href="http://www.navfac.navy.mil/" target="_blank"><img src="/sites/default/files/navfac.jpg" alt="NAVFAC logo" width="639" height="73" /></a></p><p>&nbsp;</p>