Construction is now complete on the revamped Newman Catholic Center! Partnering with architect Greg Wilhelm, our own Ian Shoebridge, P.E., was involved with the design from start to finish. Ian was instrumental in bringing together the 12′ retaining walls, curved glue-laminated beams, and custom steel frames to form a structure that not only preserved the integrity of the existing center, but also expanded it to form a marvelous sanctuary. Check out the before and after contrast, and go here to see photos from the first mass.
